Costs for New Nuclear Reactors

A week or two ago, FuturePundit sparked a long string of comments regarding the cost of new nuclear reactors in the United States. The blogger found it difficult to find good information on the projected costs of new nuclear units in this country, and as a result had difficulty accurately comparing future nuclear electric power costs to fossil fuel electric power costs.

To ensure a common basis for comparison, the capital costs of electric generating technologies are expressed in dollars per kilowatt of capacity. The capital costs used in such comparisons are so-called “overnight” capital costs—i.e., they assume the plant is built “overnight” and thus do not include interest charges and financing costs.

In order to provide competitive electricity, the nuclear industry has determined that the next generation of nuclear reactors must have overnight capital costs in the range of $1,000 – $1,200 per kilowatt of generating capacity for the so called “Nth-of-a-kind” nuclear plant. Nth-of-a-kind capital costs are achieved after first-time design and engineering costs have been recovered and as industry incorporates improvements in construction techniques and construction management gained during construction of the first few units.

The industry’s capital cost targets have a sound basis in rigorous estimates performed by reactor vendors. Westinghouse has invested millions of dollars evaluating its estimates for the AP1000 Advanced Light Water Reactor (ALWR), and their estimates have been verified and endorsed by the Electric Power Research Institute (EPRI), multiple utilities, and several international architect-engineers, including The Lungmen (Dragon Gate) nuclear projectin Taiwan.

Areva’s European Pressurized Water Reactor, which is currently under construction in Olkiluoto, Finland, is anticipated to be completed within 48 months; similar schedules are believed possible in the United States. The US nuclear industry is currently in the process of solidifying and streamlining the process through which new plants will be built, via early site-permitting and a combined operating and licensing procedure that will avoid delays such as those experienced by the first generation of US plants.

Technorati tags: , , , , ,

Comments

Popular posts from this blog

Activists' Claims Distort Facts about Advanced Reactor Design

Below is from our rapid response team . Yesterday, regional anti-nuclear organizations asked federal nuclear energy regulators to launch an investigation into what it claims are “newly identified flaws” in Westinghouse’s advanced reactor design, the AP1000. During a teleconference releasing a report on the subject, participants urged the Nuclear Regulatory Commission to suspend license reviews of proposed AP1000 reactors. In its news release, even the groups making these allegations provide conflicting information on its findings. In one instance, the groups cite “dozens of corrosion holes” at reactor vessels and in another says that eight holes have been documented. In all cases, there is another containment mechanism that would provide a barrier to radiation release. Below, we examine why these claims are unwarranted and why the AP1000 design certification process should continue as designated by the NRC. Myth: In the AP1000 reactor design, the gap between the shield bu...

What Happens During a Refueling Outage?

You may have noticed over the past few weeks that a number of nuclear plants are shut down for refueling outages or are resuming operations after just returning from one. This type of routine outage usually occurs in the spring or fall when electricity demand is low so that nuclear reactors can replace about one-third of the spent fuel rods with new fuel and conduct other routine maintenance and repairs at the plant. To get a better sense of how refueling works at a nuclear energy facility, I spoke with Marcus Nichol, NEI’s senior project manager for used fuel storage and transportation, and asked him to explain the basics. Why does a nuclear plant need to replace one-third of its fuel? Nichol: The main purpose of a refueling outage is to replace older fuel that is depleted—meaning it can no longer efficiently produce energy from nuclear fission reactions—with new fuel. This “used fuel” has typically been used in the reactor for four-and-a-half to six years before it is pe...

Nuclear Utility Moves Up in Credit Ratings, Bank is "Comfortable with Nuclear Strategy"

Some positive signs that nuclear utilities can continue to receive positive ratings even while they finance new nuclear plants for the first time in decades: Wells Fargo upgrades SCANA to Outperform from Market Perform Wells analyst says, "YTD, SCG shares have underperformed the Regulated Electrics (total return +2% vs. +9%). Shares trade at 11.3X our 10E EPS, a modest discount to the peer group median of 11.8X. We view the valuation as attractive given a comparatively constructive regulatory environment and potential for above-average long-term EPS growth prospects ... Comfortable with Nuclear Strategy. SCG plans to participate in the development of two regulated nuclear units at a cost of $6.3B, raising legitimate concerns regarding financing and construction. We have carefully considered the risks and are comfortable with SCG’s strategy based on a highly constructive political & regulatory environment, manageable financing needs stretched out over 10 years, strong partners...