Skip to main content

NRC Moves to Adopt EPA Radiation Standard for Yucca Mountain

From the NRC:
The Nuclear Regulatory Commission is proposing to amend its regulations to govern the U.S. Department of Energy’s (DOE’s) proposed high-level radioactive waste disposal facility at Yucca Mountain, Nev. The amendments would adopt the U.S. Environmental Protection Agency’s (EPA’s) recently proposed revisions to its standards for radiation doses that could occur more than 10,000 years after waste disposal.

The Energy Policy Act requires the NRC to make its regulations consistent with EPA’s standards for Yucca Mountain.

The new EPA standards, published Aug. 22, would leave in place the current standard of a peak dose of 15 millirems for the first 10,000 years following disposal. After 10,000 years, the standard would be 350 millirems. These same EPA values would be contained in the revised NRC regulations.

The proposed NRC regulations also indicate that, in demonstrating compliance with the radiation dose standards, DOE must assess the effects of climate changes more than 10,000 years after disposal. The proposal specifies a range of values that DOE should draw from when representing these changes. The climate change analysis would be limited to the effects of increased water flow to the repository as a result of the change (up to approximately 6 times greater than would be expected today), and any resulting release of radioactive materials to the environment.

In addition, the proposed NRC changes specify that DOE should calculate radiation doses to workers at the Yucca Mountain facility using current scientific methods, in the same way that EPA is proposing for calculating doses for members of the public.
Back on August 24, NEI released this statement regarding the new EPA standard.

Technorati tags:

Comments

Popular posts from this blog

Activists' Claims Distort Facts about Advanced Reactor Design

Below is from our rapid response team . Yesterday, regional anti-nuclear organizations asked federal nuclear energy regulators to launch an investigation into what it claims are “newly identified flaws” in Westinghouse’s advanced reactor design, the AP1000. During a teleconference releasing a report on the subject, participants urged the Nuclear Regulatory Commission to suspend license reviews of proposed AP1000 reactors. In its news release, even the groups making these allegations provide conflicting information on its findings. In one instance, the groups cite “dozens of corrosion holes” at reactor vessels and in another says that eight holes have been documented. In all cases, there is another containment mechanism that would provide a barrier to radiation release. Below, we examine why these claims are unwarranted and why the AP1000 design certification process should continue as designated by the NRC. Myth: In the AP1000 reactor design, the gap between the shield bu...

What Happens During a Refueling Outage?

You may have noticed over the past few weeks that a number of nuclear plants are shut down for refueling outages or are resuming operations after just returning from one. This type of routine outage usually occurs in the spring or fall when electricity demand is low so that nuclear reactors can replace about one-third of the spent fuel rods with new fuel and conduct other routine maintenance and repairs at the plant. To get a better sense of how refueling works at a nuclear energy facility, I spoke with Marcus Nichol, NEI’s senior project manager for used fuel storage and transportation, and asked him to explain the basics. Why does a nuclear plant need to replace one-third of its fuel? Nichol: The main purpose of a refueling outage is to replace older fuel that is depleted—meaning it can no longer efficiently produce energy from nuclear fission reactions—with new fuel. This “used fuel” has typically been used in the reactor for four-and-a-half to six years before it is pe...

Nuclear Utility Moves Up in Credit Ratings, Bank is "Comfortable with Nuclear Strategy"

Some positive signs that nuclear utilities can continue to receive positive ratings even while they finance new nuclear plants for the first time in decades: Wells Fargo upgrades SCANA to Outperform from Market Perform Wells analyst says, "YTD, SCG shares have underperformed the Regulated Electrics (total return +2% vs. +9%). Shares trade at 11.3X our 10E EPS, a modest discount to the peer group median of 11.8X. We view the valuation as attractive given a comparatively constructive regulatory environment and potential for above-average long-term EPS growth prospects ... Comfortable with Nuclear Strategy. SCG plans to participate in the development of two regulated nuclear units at a cost of $6.3B, raising legitimate concerns regarding financing and construction. We have carefully considered the risks and are comfortable with SCG’s strategy based on a highly constructive political & regulatory environment, manageable financing needs stretched out over 10 years, strong partners...