Nuclear Industry Skeptic Turns into Believer

My name is Jennifer Correa, and I am a mechanical engineer with Structural Integrity Associates. I have been in the nuclear industry for about 13 years. At Structural Integrity, I co-manage the Fatigue Management Product, which deals with the fatigue of metal components due to changes in pressure and temperature in nuclear power plants. If the conditions that lead to metal fatigue are managed well, the components can operate safely for many years, well beyond the original licensing period.
Jennifer Correa
Jennifer Correa
Before I came to Structural Integrity, I didn’t know much about nuclear power. I understood it at a basic level, but only so far as the introduction that I received as part of my general mechanical engineering coursework. It was kind of mysterious and I had a vague idea that it was dangerous and risky. I’m a Californian and the opposition to nuclear power is strong in parts of this state. When I came to work for Structural Integrity, I was skeptical of nuclear power. Yet, over time, as I learned more about the design and operation of the plants, and about the regulatory environment in which the plants operate, I became convinced that nuclear power is an important part of our power mix and that we don’t take undue risks by having nuclear plants in our country.

My favorite part of my job is working with our clients to solve aging management issues. We help them determine the best course for their plant’s needs and then use our tools to meet those needs. This includes help with License Renewal Application preparation, ASME Section III fatigue analyses, Environmentally-Assisted Fatigue analysis, and so on. One of the tools of which I am especially proud is a cycle and fatigue management software called SI:FatiguePro 4.0, which we developed here at Structural Integrity (originally under EPRI sponsorship in the 1980s). Our software can be customized to the needs of each plant and is used to help manage fatigue by tracking plant transients and fatigue usage in critical components over time. With this software, plant engineers can monitor metal fatigue at their plants to ensure that cycle and fatigue limits are not exceeded. If any limits are projected to be exceeded, then the software gives them an early warning so that they can make plans to correct the issue before it becomes a problem.  

I think that the public would be more accepting of nuclear power if people understood the basics of how nuclear plants work. Most people would be surprised to learn that the amount of nuclear fuel used to operate nuclear plants is very small and that this fuel is used only as a heat source to turn water into steam, just like any other electrical generating plant that uses steam to run its turbines. The hyperbolic cooling towers, which have come to symbolize the nuclear power industry, are just cooling towers for secondary-side (non-radioactive) water – these types of towers are widely used in applications where large volumes of hot water must be cooled quickly, not just for generating nuclear power. The steam that we see coming out the top and the water being recirculated back into lakes, rivers, and oceans is closely monitored to ensure levels of radioactivity are well below federal limits. The water that runs through the reactors themselves, which does contain radioactive particles, is isolated from the water released back into the environment.  

Nuclear power generation is the only currently available method of generating large amounts of electricity, 24 hours a day, without producing any carbon emissions. Also, nuclear reactors do not emit any of the six air pollutants identified in the Clean Air Act: ozone, particulate matter, carbon monoxide, nitrogen oxide, sulfur dioxide or lead. In our current environment, we are focused on reducing carbon emissions, and this makes nuclear energy an extremely important part of the power generation mix for fighting pollution.  

The above post by Structural Integrity Associates is a part of NEI’s Powered by Our People promotion which showcases the innovators within the nation’s nuclear energy workforce.

For more on this promotion, follow the #futureofenergy tag across our digital channels. 

Comments

Popular posts from this blog

Activists' Claims Distort Facts about Advanced Reactor Design

Below is from our rapid response team . Yesterday, regional anti-nuclear organizations asked federal nuclear energy regulators to launch an investigation into what it claims are “newly identified flaws” in Westinghouse’s advanced reactor design, the AP1000. During a teleconference releasing a report on the subject, participants urged the Nuclear Regulatory Commission to suspend license reviews of proposed AP1000 reactors. In its news release, even the groups making these allegations provide conflicting information on its findings. In one instance, the groups cite “dozens of corrosion holes” at reactor vessels and in another says that eight holes have been documented. In all cases, there is another containment mechanism that would provide a barrier to radiation release. Below, we examine why these claims are unwarranted and why the AP1000 design certification process should continue as designated by the NRC. Myth: In the AP1000 reactor design, the gap between the shield bu...

What Happens During a Refueling Outage?

You may have noticed over the past few weeks that a number of nuclear plants are shut down for refueling outages or are resuming operations after just returning from one. This type of routine outage usually occurs in the spring or fall when electricity demand is low so that nuclear reactors can replace about one-third of the spent fuel rods with new fuel and conduct other routine maintenance and repairs at the plant. To get a better sense of how refueling works at a nuclear energy facility, I spoke with Marcus Nichol, NEI’s senior project manager for used fuel storage and transportation, and asked him to explain the basics. Why does a nuclear plant need to replace one-third of its fuel? Nichol: The main purpose of a refueling outage is to replace older fuel that is depleted—meaning it can no longer efficiently produce energy from nuclear fission reactions—with new fuel. This “used fuel” has typically been used in the reactor for four-and-a-half to six years before it is pe...

Nuclear Utility Moves Up in Credit Ratings, Bank is "Comfortable with Nuclear Strategy"

Some positive signs that nuclear utilities can continue to receive positive ratings even while they finance new nuclear plants for the first time in decades: Wells Fargo upgrades SCANA to Outperform from Market Perform Wells analyst says, "YTD, SCG shares have underperformed the Regulated Electrics (total return +2% vs. +9%). Shares trade at 11.3X our 10E EPS, a modest discount to the peer group median of 11.8X. We view the valuation as attractive given a comparatively constructive regulatory environment and potential for above-average long-term EPS growth prospects ... Comfortable with Nuclear Strategy. SCG plans to participate in the development of two regulated nuclear units at a cost of $6.3B, raising legitimate concerns regarding financing and construction. We have carefully considered the risks and are comfortable with SCG’s strategy based on a highly constructive political & regulatory environment, manageable financing needs stretched out over 10 years, strong partners...