Guest Post: Mom Responds To Nuclear Emergency

The following guest post comes from Elizabeth McAndrew-Benavides, senior manager of workforce policy and programs at NEI:
Anne Shatara is a single, working mother who in addition to her regular job at a nuclear energy facility has an intriguing third job. She is part of the facility’s emergency response organization (ERO).

"I hold the position of dose assessor," said Anne. "In the event of an emergency, this position is responsible for gathering data and determining if radiation is leaking from the facility."

Elizabeth McAndrew-Benavides
Many wonder who is eligible to serve on an emergency response team.  The answer is almost any nuclear power plant employee.  Once eligible, employees receive specialized qualification training; they participate in numerous drills and annual re-qualify for their assigned position.

Anne's position requires her to report to her assigned emergency response facility within 60 minutes of a declared emergency. She said she held an emergency response position before having a child and has continued to hold it since her child was born five years ago.

"Personally, I did not ask to be removed from the ERO after his birth," said Anne. "During my maternity leave, other ERO members qualified for the same position were responsible for covering for me while I recovered."

As a single mother, being on call to respond to an emergency does create logistical challenges. "When my son was younger and I was on-call, I always made sure there was an emergency bag in the car with us," Anne said. "That way, in the event I had to respond during non-work hours, I would have snacks, toys, diapers, and extra clothes for him."

This preplanning paid off for Anne. Two years ago she had to take her son with her when her facility scheduled an off-duty ERO drill. Anne said, "I was making dinner when my pager went off. I had to drop what I was doing and report to my ERO location as soon as possible. "

Many have asked Anne if she reconsidered her position on the ERO after the tragedy in Fukushima. Her response was unequivocal. "I never question participating on the ERO. I feel it is part of my responsibility as a nuclear energy facility employee."

Many worry that ERO members will respond differently in a real situation than they do during a drill. Anne rejects this claim and explained, "We frequently conduct drills in order to prepare for an event if one was to take place. As any high performing team practices before a game, we practice like it’s a real event so we know what to expect and gain proficiency on our emergency response procedures and protocols."

Ann said she's seen this preparedness put into practice the one time she had to respond to an Alert at her facility. An alert is the second lowest level of emergency.

"It happened during work and my son was at childcare," said Anne. "I responded to my facility as required but my first phone call was to the preschool followed by a friend to ensure my son would be picked up and cared for until I was released."

The Alert ended after seven hours, and Anne was able to pick her son up from her friend. "Knowing my child was cared for and safe allowed me to focus on my task at hand as an ERO member."
Anne is just one example of many Mothers in Nuclear who also serve on an emergency response team. They are all smart, organized women who are dedicated to keeping us safe.

Comments

jimwg said…
Good piece!

I'd LOVE to see these nuclear mothers "spread and share their skills" before a subcommittee by asking why the onus is so hard in forcing nuclear plants to have evacuation plans and alarm sirens countywide when oil, gas, chemical and hydro facilitates which have a record of far far more "accidents" that have historically killed far far more while putting away whole counties in the process get away with having nil or zit or zero or none. The political and regulatory discrimination and hypocrisy screams in its silence.

James Greenidge
Queens NY

Popular posts from this blog

Activists' Claims Distort Facts about Advanced Reactor Design

Below is from our rapid response team . Yesterday, regional anti-nuclear organizations asked federal nuclear energy regulators to launch an investigation into what it claims are “newly identified flaws” in Westinghouse’s advanced reactor design, the AP1000. During a teleconference releasing a report on the subject, participants urged the Nuclear Regulatory Commission to suspend license reviews of proposed AP1000 reactors. In its news release, even the groups making these allegations provide conflicting information on its findings. In one instance, the groups cite “dozens of corrosion holes” at reactor vessels and in another says that eight holes have been documented. In all cases, there is another containment mechanism that would provide a barrier to radiation release. Below, we examine why these claims are unwarranted and why the AP1000 design certification process should continue as designated by the NRC. Myth: In the AP1000 reactor design, the gap between the shield bu...

How many nuclear plants does it take to meet the world's energy needs?

Several weeks ago Joshua Pearce at Clarion University in Pennsylvania released a study titled “ Thermodynamic limitations to nuclear energy deployment as a greenhouse gas mitigation technology .” In the study he stated... nuclear energy production would have to increase by 10.5% per year from 2010 to 2050 to both replace fossil-fuel-energy use and meet the future energy demands. This line, of course, made the headlines and has been picked up by several outlets and blogs . When looking into his calculations for this statement, he made one assumption error that overstated the above sentence by nearly a factor of three. Page 121, Section 4.1 of the study states: Richard Smalley pointed out that in 2004, the global economy consumed the equivalent of 220 million barrels of oil per day, which converted into electricity terms is the equivalent of 14.5 TeraWatts (TW), or 14,500,000 MegaWatts (MW) (2005). … With a nuclear plant having about 1000 MW (1 GW) of capacity, we would need 14,500...

What Happens During a Refueling Outage?

You may have noticed over the past few weeks that a number of nuclear plants are shut down for refueling outages or are resuming operations after just returning from one. This type of routine outage usually occurs in the spring or fall when electricity demand is low so that nuclear reactors can replace about one-third of the spent fuel rods with new fuel and conduct other routine maintenance and repairs at the plant. To get a better sense of how refueling works at a nuclear energy facility, I spoke with Marcus Nichol, NEI’s senior project manager for used fuel storage and transportation, and asked him to explain the basics. Why does a nuclear plant need to replace one-third of its fuel? Nichol: The main purpose of a refueling outage is to replace older fuel that is depleted—meaning it can no longer efficiently produce energy from nuclear fission reactions—with new fuel. This “used fuel” has typically been used in the reactor for four-and-a-half to six years before it is pe...