Congress Pushing for Nuclear Surface Ships?

From Defense News:
The prospect of the U.S. Navy once again using nuclear energy to propel its larger surface warships edged a bit closer to reality May 3 with a push from a powerful congressional subcommittee.

“We are requiring that new classes of major surface combatants are designed and constructed with integrated nuclear power systems,” Rep. Gene Taylor, D-Miss., chairman of the House Armed Services seapower subcommittee, said during the panel’s markup of the 2008 defense authorization bill.

Taylor’s predecessor as chairman, Rep. Roscoe Bartlett, R-Md., echoed the call.
“Nuclear propulsion is simply the right thing to do,” said Bartlett, now the panel’s ranking minority member.

Both lawmakers have strongly supported nuclear power as a means to reduce the military’s dependence on oil for fuel. At their request, the Navy produced a study on the viability of re-introducing nuclear power into surface ships — a capability the service stopped buying in the mid-1970s.

Most observers expected the Navy study to repeat the assertions made since those years — that the dramatically higher cost of buying nuclear-propelled surface ships outweighed tactical advantages.

But appearing before the committee March 1, Delores Etter, the Navy’s top acquisition official, surprised onlookers with her testimony that the high cost of oil is making the nuclear option more economically viable — at least for some ships.
Interesting.

Comments

Rod Adams said…
It has been interesting to watch how the Navy, which prides itself as a leadership based organization, has had to be dragged kicking and screaming to a conclusion that is hard to avoid when reasonable numeric assumptions are used.

No utility executive in his right mind would suggest to his board that it would be more economical to purchase oil fired gas turbines for base load power than to purchase nuclear power plants - especially if his company OWNS approved designs that have a long track record and the proven ability to be constructed within four years of initial order! However, that is what the Navy leaders tried to do with Congress.

We are fortunate that there are at least a few numerate congressmen like Roscoe Bartlett and Gene Taylor.
Anonymous said…
To be fair Navy reactor cost, specifically fuel cost, are not comparable to the commerical sector. The highly enriched fuel used in Navy reactors does have a significant impact on the economics involved in this decision.
Anonymous said…
During a search on the progress of the "re-introduction" study, I found this blog. Anonymous is right. Somewhere, there is a study the navy did, outlining the "breakover" point where HEU reactors became more cost effective than FF ships - including the gas turbine designs. I can't find it now, but I seem to remember that the point was when the price of fuel was somewhere around $200.00 per ton. Of course we are well beyond that now. Personally, I believe Rickover would have driven this a lot harder if he was still alive.

Popular posts from this blog

Activists' Claims Distort Facts about Advanced Reactor Design

Below is from our rapid response team . Yesterday, regional anti-nuclear organizations asked federal nuclear energy regulators to launch an investigation into what it claims are “newly identified flaws” in Westinghouse’s advanced reactor design, the AP1000. During a teleconference releasing a report on the subject, participants urged the Nuclear Regulatory Commission to suspend license reviews of proposed AP1000 reactors. In its news release, even the groups making these allegations provide conflicting information on its findings. In one instance, the groups cite “dozens of corrosion holes” at reactor vessels and in another says that eight holes have been documented. In all cases, there is another containment mechanism that would provide a barrier to radiation release. Below, we examine why these claims are unwarranted and why the AP1000 design certification process should continue as designated by the NRC. Myth: In the AP1000 reactor design, the gap between the shield bu...

How many nuclear plants does it take to meet the world's energy needs?

Several weeks ago Joshua Pearce at Clarion University in Pennsylvania released a study titled “ Thermodynamic limitations to nuclear energy deployment as a greenhouse gas mitigation technology .” In the study he stated... nuclear energy production would have to increase by 10.5% per year from 2010 to 2050 to both replace fossil-fuel-energy use and meet the future energy demands. This line, of course, made the headlines and has been picked up by several outlets and blogs . When looking into his calculations for this statement, he made one assumption error that overstated the above sentence by nearly a factor of three. Page 121, Section 4.1 of the study states: Richard Smalley pointed out that in 2004, the global economy consumed the equivalent of 220 million barrels of oil per day, which converted into electricity terms is the equivalent of 14.5 TeraWatts (TW), or 14,500,000 MegaWatts (MW) (2005). … With a nuclear plant having about 1000 MW (1 GW) of capacity, we would need 14,500...

What Happens During a Refueling Outage?

You may have noticed over the past few weeks that a number of nuclear plants are shut down for refueling outages or are resuming operations after just returning from one. This type of routine outage usually occurs in the spring or fall when electricity demand is low so that nuclear reactors can replace about one-third of the spent fuel rods with new fuel and conduct other routine maintenance and repairs at the plant. To get a better sense of how refueling works at a nuclear energy facility, I spoke with Marcus Nichol, NEI’s senior project manager for used fuel storage and transportation, and asked him to explain the basics. Why does a nuclear plant need to replace one-third of its fuel? Nichol: The main purpose of a refueling outage is to replace older fuel that is depleted—meaning it can no longer efficiently produce energy from nuclear fission reactions—with new fuel. This “used fuel” has typically been used in the reactor for four-and-a-half to six years before it is pe...