Handout photo shows the control room for the No. 2 reactor at the Fukushima Daiichi Nuclear Power Station in Fukushima Prefecture on March 26, 2011. Tokyo Electric Power Co. restored lighting in the room the same day as part of efforts to bring the crippled plant under control.
Nuclear News Roundup for March 1, 2012
20 minutes ago

1 comments:
Bless those brave souls.
Post a Comment