Energy Independence vs. NIMBYs

Over at Reason, Adrian Moore points out a problem with getting construction of new oil refineries approved that many folks in the nuclear energy industry understand all too well:
But getting an oil refinery built is next to impossible, hence the 30-year construction drought. There will always be environmental activists who fight any new proposed refinery, regardless of where it might be located and how environmentally safe it is. And our environmental rules give them the upper hand.

The environmental impact-report process mobilizes the "not in my back yard" elements to oppose any proposed refinery, but it does not mobilize people or groups who are looking at national energy needs. You wind up with a very lopsided discussion where potential problems are thoroughly and perhaps overly represented, but the only group pointing out the benefits of the refinery is the "evil" oil company asking to build it - even though every automobile driver would benefit.

Consider the example of Arizona Clean Fuels, which has been trying to build a small refinery outside Yuma for almost 10 years. It took five years just to get air-quality permits. Now they hope to be operational in 2010, 15 years after they started the project.
Back during the 1970s, the approval process for new nuclear power plants became unwieldy to say the least. And considering the high capital costs required to build a new nuclear plant, delays always proved costly.

As part of the Energy Policy Act of 1992, Congress created the Early Site Permit process; and a second called the Combined Construction and Operating License. Though untested, they both promise to streamline locating and building nuclear power plants, and helping utilities avoid some serious financial risks before the plant even opens.

Technorati tags:

Comments

Engineer-Poet said…
There ought to be an economical way to handle this.  Maybe NIMBY taxes with IMBY credits?

Popular posts from this blog

Activists' Claims Distort Facts about Advanced Reactor Design

Below is from our rapid response team . Yesterday, regional anti-nuclear organizations asked federal nuclear energy regulators to launch an investigation into what it claims are “newly identified flaws” in Westinghouse’s advanced reactor design, the AP1000. During a teleconference releasing a report on the subject, participants urged the Nuclear Regulatory Commission to suspend license reviews of proposed AP1000 reactors. In its news release, even the groups making these allegations provide conflicting information on its findings. In one instance, the groups cite “dozens of corrosion holes” at reactor vessels and in another says that eight holes have been documented. In all cases, there is another containment mechanism that would provide a barrier to radiation release. Below, we examine why these claims are unwarranted and why the AP1000 design certification process should continue as designated by the NRC. Myth: In the AP1000 reactor design, the gap between the shield bu...

How many nuclear plants does it take to meet the world's energy needs?

Several weeks ago Joshua Pearce at Clarion University in Pennsylvania released a study titled “ Thermodynamic limitations to nuclear energy deployment as a greenhouse gas mitigation technology .” In the study he stated... nuclear energy production would have to increase by 10.5% per year from 2010 to 2050 to both replace fossil-fuel-energy use and meet the future energy demands. This line, of course, made the headlines and has been picked up by several outlets and blogs . When looking into his calculations for this statement, he made one assumption error that overstated the above sentence by nearly a factor of three. Page 121, Section 4.1 of the study states: Richard Smalley pointed out that in 2004, the global economy consumed the equivalent of 220 million barrels of oil per day, which converted into electricity terms is the equivalent of 14.5 TeraWatts (TW), or 14,500,000 MegaWatts (MW) (2005). … With a nuclear plant having about 1000 MW (1 GW) of capacity, we would need 14,500...

What Happens During a Refueling Outage?

You may have noticed over the past few weeks that a number of nuclear plants are shut down for refueling outages or are resuming operations after just returning from one. This type of routine outage usually occurs in the spring or fall when electricity demand is low so that nuclear reactors can replace about one-third of the spent fuel rods with new fuel and conduct other routine maintenance and repairs at the plant. To get a better sense of how refueling works at a nuclear energy facility, I spoke with Marcus Nichol, NEI’s senior project manager for used fuel storage and transportation, and asked him to explain the basics. Why does a nuclear plant need to replace one-third of its fuel? Nichol: The main purpose of a refueling outage is to replace older fuel that is depleted—meaning it can no longer efficiently produce energy from nuclear fission reactions—with new fuel. This “used fuel” has typically been used in the reactor for four-and-a-half to six years before it is pe...