Michael Mariotte from NIRS Needs to Update His Cost Sources

Tampa Tribune’s “Nuclear Costs Explode” piece provided some updated insights to the estimated costs of a new nuclear plant. The article began with Progress Energy’s cost reassessment of a new nuke from an initial estimate of about $5-7 billion per plant. “Based on new industry estimates, the tab for Progress Energy's project could surpass $10 billion.” The reason for the increase:
because the cost of concrete, steel, copper, labor and reactor technology has soared as energy companies move forward with plans to build more than 30 new reactors nationwide. Also, Progress Energy's initial estimate excluded the cost of land, inflation, interest payments and new transmission lines.



A September 2007 report commissioned by the Edison Electric Institute, a nonprofit trade group for the nation's electric utilities, showed that steel prices have risen 60 percent since 2003. Copper prices nearly quadrupled between 2003 and 2006 and cement prices rose 30 percent during the same period, the report said.
The nuclear industry is keenly aware of these commodity price increases, so this wasn’t exactly news. What caught my attention, though, was the quote from Michael Mariotte of the Nuclear Information and Resource Service:
"Moody's is closer to the reality we're seeing," said Michael Mariotte, executive director of the Nuclear Information and Resource Service, a nonprofit group opposed to nuclear power. "Even before they start building, the costs are going up. Meanwhile, the cost for solar, wind and energy efficiency are on a downward trend."
Notice the last sentence. Apparently Mr. Mariotte is unaware solar and wind rely on these commodities as well. It would be shortsighted for him to think commodity prices only affect nuclear plants.

When pulling together updated sources for Mr. Mariotte, I found little cost information for solar. The prime reason is because only 100 MW of solar capacity have come online in the past three years compared to nearly 11,000 MW of wind since 2005 (source: Global Energy Decisions’ database). The cost trends for wind are easily measured. In contrast, solar data is sparse.

Below are several pieces on the effect of increasing commodity prices on the wind industry. Here’s a New York Times piece from July 2007:
Renewable energy is not immune. “Costs have increased for wind as they have for other technologies,” said Christine Real de Azua, a spokeswoman for the American Wind Energy Association. “While wind farm operations are not hit by fuel price volatility, steep increases in the cost of raw materials like copper and steel and other factors have driven up the price of wind turbines,” she said in an e-mail statement.

Her association recently republished data from a utility that buys large amounts of wind power, Puget Sound Energy, showing that prices in 2006 ranged from about 8 cents to 10.5 cents a kilowatt-hour, up from 2004, when it was 4.5 to 6 cents. A recent study by the National Renewable Energy Laboratory, part of the Department of Energy, showed a steadily declining price from 1999 to 2005, but an increase in 2006. The study said that wind power was generally competitive with other sources of energy but that rising costs were “starting to erode that value.”
Here is the NREL Annual Report on wind (pdf) the NYT references:
More recently, however, costs have increased: among our sample of projects built in 2006, reported installed costs ranged from $1,150/kW to $2,240/kW, with an average cost of $1,480/kW – up $220/kW (18%) from $1,260/kW in 2005.

Moreover, there is reason to believe that recent increases in turbine costs did not fully work their way into installed project costs in 2006 – the average 2006 cost estimate for proposed projects in our sample (not shown in Figure 18) was $1,680/kW, or $200/kW higher than for projects completed in 2006. Anecdotal information from industry suggests that project costs may reach an average of $1,800/kW or higher in future years. (p. 15)
EIA’s Annual Energy Outlook 2007 (pdf) published nearly a year ago devoted six pages to the “Impacts of Rising Construction and Equipment Costs on Energy Industries”:
Costs related to the construction industry have been volatile in recent years. Some of the volatility may be related to higher energy prices. Prices for iron and steel, cement, and concrete—commodities used heavily in the construction of new energy projects— rose sharply from 2004 to 2006, and shortages have been reported. (p. 36)
For the best source on recent construction price increases, check out the Edison Foundation’s (EEI) “Rising Utility Construction Costs” paper (pdf). This paper analyzes the effects construction commodity prices have had on the entire power sector. What the reader may be wondering, though, is what’s causing these prices to increase. Read below:
Broadly speaking, there are four primary sources of the increase in construction costs: (1) material input costs, including the cost of raw physical inputs, such as steel and cement as well as increased costs of components manufactured from these inputs (e.g., transformers, turbines, pumps); (2) shop and fabrication capacity for manufactured components (relative to current demand); (3) the cost of construction field labor, both unskilled and craft labor; and (4) the market for large construction project management, i.e., the queuing and bidding for projects. (p. 13)
Electricity consumers beware; check out the last sentence in the conclusion:
In the long run, customers ultimately will pay for higher construction costs—either directly in rates for completed assets of regulated companies, less directly in the form of higher energy prices needed to attract new generating capacity in organized markets and in higher transmission tariffs, or indirectly when rising construction costs defer investments and delay expected benefits such as enhanced reliability and lower, more stable long-term electricity prices.
The nation faces a tremendous challenge in rebuilding and expanding the infrastructure that provides the reliable electricity on which our economy now depends. Electricity prices are expected to rise substantially in the next 10 years as utilities tackle the backlog of generation and transmission projects needed to replace outdated plants and meet new demand. The rise in commodity, labor, and component prices is affecting projected costs for all new electric generating projects, not just (and not uniquely) nuclear.

Comments

Anonymous said…
Since the carbon footprint to construct wind, solar , and nuclear seem to be similar, it would seem that increases in construction costs per KWH delivered would be also similar.
Steve Packard said…
There is no doubt that the cost of building a nuclear plant is high (although not really by that much compared to other types of energy generation.)

But it's relatively cheap to operate and has a lifetime of at least 30 years before it would need a new reactor and possibly much longer.

It's basically an investment in the future. You bite the bullet on the cost and it takes a few years to pay it off (depending on the capital situation). But once it's built you have a new capability and you cruise from there.

it's not much different from something like the Hoover dam. It took a lot of money to build but it was paid off and running well by the 1950's. Since then the operators can kick back and cruise with minimal upkeep costs.

New capabilities always cost more in the short run but are better than cheap bandaid solutions which never really address the problem
Anonymous said…
Solarbuzz has a handy historical cost index for solar power.

It's been basically static (in nominal dollar terms) for the past few years. That's probably better than most other energy sources - but, of course, it's so far in excess of even the retail cost of electricity in most Western countries as to be almost completely irrelevant.
memeticist said…
While increasing material costs influence renewable generation costs, it is not the case that both renewables and nuclear are effected identically. Nuclear power has long construction times which are often delayed. I know from my conversations with Dominion managers that materials cost are an especially tricky component of the North Anna 3 negotiations.

With relative quick and much more predictable construction schedules, wind power options don't have to pay the same risk premium for materials that nuclear does.

Nor are high materials costs the only problem that prospective reactor builders face. The inherent complexity of these projects tends to inflate costs. US reactors have a terrible cost overrun and delay history.

Avera just announced it's 4 delay for the Finnish EPR, already 3 years delayed and over $2 billion over budget. If wind power exhibited these huge overruns, no private money would be invested in it.

Which is why nuclear requires large state subsidies to exist.

Popular posts from this blog

An Ohio School Board Is Working to Save Nuclear Plants

Ohio faces a decision soon about its two nuclear reactors, Davis-Besse and Perry, and on Wednesday, neighbors of one of those plants issued a cry for help. The reactors’ problem is that the price of electricity they sell on the high-voltage grid is depressed, mostly because of a surplus of natural gas. And the reactors do not get any revenue for the other benefits they provide. Some of those benefits are regional – emissions-free electricity, reliability with months of fuel on-site, and diversity in case of problems or price spikes with gas or coal, state and federal payroll taxes, and national economic stimulus as the plants buy fuel, supplies and services. Some of the benefits are highly localized, including employment and property taxes. One locality is already feeling the pinch: Oak Harbor on Lake Erie, home to Davis-Besse. The town has a middle school in a building that is 106 years old, and an elementary school from the 1950s, and on May 2 was scheduled to have a referendu

Why Ex-Im Bank Board Nominations Will Turn the Page on a Dysfunctional Chapter in Washington

In our present era of political discord, could Washington agree to support an agency that creates thousands of American jobs by enabling U.S. companies of all sizes to compete in foreign markets? What if that agency generated nearly billions of dollars more in revenue than the cost of its operations and returned that money – $7 billion over the past two decades – to U.S. taxpayers? In fact, that agency, the Export-Import Bank of the United States (Ex-Im Bank), was reauthorized by a large majority of Congress in 2015. To be sure, the matter was not without controversy. A bipartisan House coalition resorted to a rarely-used parliamentary maneuver in order to force a vote. But when Congress voted, Ex-Im Bank won a supermajority in the House and a large majority in the Senate. For almost two years, however, Ex-Im Bank has been unable to function fully because a single Senate committee chairman prevented the confirmation of nominees to its Board of Directors. Without a quorum

NEI Praises Connecticut Action in Support of Nuclear Energy

Earlier this week, Connecticut Gov. Dannel P. Malloy signed SB-1501 into law, legislation that puts nuclear energy on an equal footing with other non-emitting sources of energy in the state’s electricity marketplace. “Gov. Malloy and the state legislature deserve praise for their decision to support Dominion’s Millstone Power Station and the 1,500 Connecticut residents who work there," said NEI President and CEO Maria Korsnick. "By opening the door to Millstone having equal access to auctions open to other non-emitting sources of electricity, the state will help preserve $1.5 billion in economic activity, grid resiliency and reliability, and clean air that all residents of the state can enjoy," Korsnick said. Millstone Power Station Korsnick continued, "Connecticut is the third state to re-balance its electricity marketplace, joining New York and Illinois, which took their own legislative paths to preserving nuclear power plants in 2016. Now attention should