Nuclear Myth-Busting at Spiked Online

Rob Johnston put together some great nuclear myth-busting in anticipation of the UK's "green light to the building of new nuclear power stations in the UK." My favorite myth is number 6:
6) Building reactors takes too long

This is perhaps the most ironic of the anti-nuclear arguments, since the legal manoeuvrings of Greenpeace delayed the UK government’s nuclear decision by a year and it is the very opposition of greens that will cause most of the future delays.

Comments

Joffan said…
My two rhetorical responses to the nuclear build schedule objection are:

1. So, were you supporting new nuclear build ten years ago, when it wasn't "too late"?

and

2. Do you really think we won't need any more low-carbon energy in ten years' time?

although I should maybe add a third arising from this:

3. Do you solemnly swear not to delay the nuclear build process?

There is also of course the example of France, that went nuclear in a total timescale of about 20 years.
Anonymous said…
It's a similar strategy used in the opposition to the waste disposal process. The no-nooks claim that nuclear is bad because "there is no where to store the waste". But look who are the ones who rise up in opposition to Yucca Mountain. Sure, there is "no where to store the waste" if you prevent development of a storage facility.

So then we ask, well, you're against Yucca Mountain, where to you want us to store it? And they say, "at the plant sites". But then they turn around and hammer the industry for storing spent fuel at the plants, because "that makes them a terrorist target". But, gee, you're the ones opposing Yucca Mountain, we can't ship it off site because you say we should keep the fuel at the plants, but that's bad so we should do it? I mean, make up your mind, wackos.

Popular posts from this blog

Activists' Claims Distort Facts about Advanced Reactor Design

Below is from our rapid response team . Yesterday, regional anti-nuclear organizations asked federal nuclear energy regulators to launch an investigation into what it claims are “newly identified flaws” in Westinghouse’s advanced reactor design, the AP1000. During a teleconference releasing a report on the subject, participants urged the Nuclear Regulatory Commission to suspend license reviews of proposed AP1000 reactors. In its news release, even the groups making these allegations provide conflicting information on its findings. In one instance, the groups cite “dozens of corrosion holes” at reactor vessels and in another says that eight holes have been documented. In all cases, there is another containment mechanism that would provide a barrier to radiation release. Below, we examine why these claims are unwarranted and why the AP1000 design certification process should continue as designated by the NRC. Myth: In the AP1000 reactor design, the gap between the shield bu...

How many nuclear plants does it take to meet the world's energy needs?

Several weeks ago Joshua Pearce at Clarion University in Pennsylvania released a study titled “ Thermodynamic limitations to nuclear energy deployment as a greenhouse gas mitigation technology .” In the study he stated... nuclear energy production would have to increase by 10.5% per year from 2010 to 2050 to both replace fossil-fuel-energy use and meet the future energy demands. This line, of course, made the headlines and has been picked up by several outlets and blogs . When looking into his calculations for this statement, he made one assumption error that overstated the above sentence by nearly a factor of three. Page 121, Section 4.1 of the study states: Richard Smalley pointed out that in 2004, the global economy consumed the equivalent of 220 million barrels of oil per day, which converted into electricity terms is the equivalent of 14.5 TeraWatts (TW), or 14,500,000 MegaWatts (MW) (2005). … With a nuclear plant having about 1000 MW (1 GW) of capacity, we would need 14,500...

What Happens During a Refueling Outage?

You may have noticed over the past few weeks that a number of nuclear plants are shut down for refueling outages or are resuming operations after just returning from one. This type of routine outage usually occurs in the spring or fall when electricity demand is low so that nuclear reactors can replace about one-third of the spent fuel rods with new fuel and conduct other routine maintenance and repairs at the plant. To get a better sense of how refueling works at a nuclear energy facility, I spoke with Marcus Nichol, NEI’s senior project manager for used fuel storage and transportation, and asked him to explain the basics. Why does a nuclear plant need to replace one-third of its fuel? Nichol: The main purpose of a refueling outage is to replace older fuel that is depleted—meaning it can no longer efficiently produce energy from nuclear fission reactions—with new fuel. This “used fuel” has typically been used in the reactor for four-and-a-half to six years before it is pe...